Mar 27, 2014

Germany’s Homemade Nuclear Waste Disaster, Germany Weighs Options for Handling Nuclear Waste in Asse Mine

Abyss of Uncertainty: Germany's Homemade Nuclear Waste Disaster (Der Spiegel, Feb 21, 2013):

Part 1: Germany's Homemade Nuclear Waste Disaster

Some 126,000 barrels of nuclear waste have been dumped in the Asse II salt mine over the last 50 years. German politicians are pushing for a law promising their removal. But the safety, technical and financial hurdles are enormous, and experts warn that removal is more dangerous than leaving them put.

It's hot and sticky 750 meters (2,500 feet) underground, and the air smells salty. Five men are standing in front of an oversized drill. They have donned orange overalls and are wearing bulky special shoes, yellow hard hats and safety glasses. They turn on the machine, and the rod assembly slowly eats its way into a gray wall.

For over seven months now, the team has been trying to drill a hole with a diameter of eight centimeters (three inches). They are attempting to reach one of the former excavation chambers of Asse II, an old salt and potash mine near the northern German town of Remlingen, in the northwestern German state of Lower Saxony. Behind a barrier 20 meters thick, thousands of drums filled with nuclear waste have been rotting away for over three decades.

It's dangerous work. Over the years, experts warn, explosive gases may have collected in underground cavities — and one spark could trigger a disaster.Consequently, the drill head is only allowed to turn extremely slowly. After the machine has barely advanced another 10 centimeters, the men pull the drill pipe out of the hole and insert a probe. They thus manage to inch their way forward about 20 centimeters per shift.

The drilling ultimately aims to provide a glimpse of the first of 13 chambers filled with barrels of waste, and to provide information on the condition of these containers — and on what measures need to be taken to remove them from the 100-year-old maze of tunnels.

It took two years to prepare this journey into the contaminated salt. Engineers had to redevelop measuring devices, design new machines and write computer programs. The men on the drilling team have volunteered for the job. They are working in a hermetically sealed space. To prevent any radioactive dust particles from reaching the rest of the mine, a constant vacuum is maintained here. There is special vinyl flooring that can be decontaminated, and the walls are lined with custom-made tiles.

German Environment Minister Peter Altmaier was on hand for the launch of the exploratory drilling on June 1, 2012. Since none of the available garb would fit him, two seamstresses had quickly sewn a white miner's outfit for the stout politician from Chancellor Angela Merkel's center-right Christian Democratic Union (CDU). Then Altmaier pressed a red button in a neighboring tunnel to symbolically start the drill.

At that moment, Germany cast itself into one of the most technically ambitious, and thus most costly, ventures of its industrial history — a bold, perhaps foolhardy, project that will consume at least €4 billion ($5.3 billion), but more likely somewhere between €5 billion and €10 billion. It's a decontamination project that will take 30 years, or longer. And no one can say with certainty whether it will ever be completed.